Home  |  Careers  |  Contact  
Search  

Active Gas Systems
Environmental Monitoring
Landfill Design and Closure
Landfill O&M
Leachate Management
Permitting
Solid Waste Planning
Transfer Stations
Waste Utilization


Active Gas Systems

Wenck has performed the complete design of several active gas extraction and collection systems. We have the capability to do the necessary modeling to estimate generation rates, develop a wellfield layout that maximizes collection efficiency, and determine the most efficient piping network. We have also been involved in landfill gas-to-energy (LGFTE) projects for a few of our clients. We have seen the projects through from the feasibility stage all the way to the construction and operation of the project.

© Wenck. All rights reserved.
Site powered by Intrcomm Technology's SMC